Skip to main content

Insights · TRACE methodologyMethodology draft

How a TRACE review assesses technical risk

Draft. This article describes a methodology that is still a draft (TRACE rubric 0.1.0, draft revision 3). It has not been adopted or calibrated against real reviews, and it may change.

TRACE is NovaScale's method for assessing technical risk against an investment thesis across five pillars: Trust, Responsiveness, Adaptability, Cost to Scale and Extensibility.

Five pillars, in a fixed order

Each pillar asks one question about the product as it is today, measured against what the investment thesis needs it to become:

  1. Trust: Can users and buyers trust the system's safety and reliability?

  2. Responsiveness: Can the team ship feedback safely and quickly?

  3. Adaptability: Can the product change with the market?

  4. Cost to Scale: Will economic and technical costs remain viable under growth?

  5. Extensibility: Can new requirements be added without destabilizing the system?

The four failure modes describe what can go wrong. The five TRACE pillars are how a review looks for evidence of it.

Evidence, confidence and what could not be seen

We report what we could not see. Missing evidence is flagged as unassessed risk, not scored as a pass or a fail.

Each review is intended to deliver an investment-committee summary; a one-page TRACE scorecard showing evidence, confidence and what could not be assessed; the material risks observed within scope, as many or as few as the evidence supports, or a statement that none were observed; a technical recommendation with its limits; and engineer-week ranges for confirmed findings.

A TRACE score is an evidence-based assessment within an agreed scope, not a certification or a guarantee.

Supplements are not extra pillars

The AI-product assessment module and the Technical Defensibility / Replicability supplement extend a review where relevant. Neither is a sixth pillar, and a replicability estimate is not a valuation conclusion.

A technical judgment, with limits

TRACE provides a technical recommendation, not an investment decision and not legal, financial, security-certification, regulatory or investment advice. The fund makes the investment decision.

A Rapid Review is not a penetration test, SOC 2 certification, comprehensive forensic audit, production load guarantee or regulatory opinion.

Source notes

  • Business Plan Draft 4 §5 (TRACE framework and outputs).
  • TRACE rubric 0.1.0, draft revision 3 (trace/rubric-v0.1.json): pillar order, evidence and confidence reporting, not-evaluated (N/E) handling. A draft accepted with documented risks (D-007), not adopted methodology.
  • Claims register rows TR-01 to TR-06, TR-13, TRO-01, INV-05, FM-05, DIS-01, DIS-02 and PR-11, quoted verbatim. INV-05 is a GATED row shown only in this draft. INV-04 is no longer used: its blanket wording does not hold for suspected findings (register amendment 10); TRO-01 states ranges for confirmed findings.

The TRACE framework page · Back to Insights